Ladder Program Example for Lifter Application

Ladder Program Example for Lifter Application



Ladder Program to carry parts to three positions using the lift.



Control Specifications


The following operation should be performed in this unit.

Study the required specifications and then create the program and confirm the operation


Overall control


  • When [PB1] (X20) on the operation panel is pressed, Supply command(Y0) for the hopper is turned ON.When [PB1] (X20) is released, Supply command (Y0) is turned OFF. When Supply command (Y0) is turned ON, the hopper supplies a part.
  • When [SW1] (X24) on the operation panel is turned ON, the conveyors move forward. When [SW1] (X24) is turned OFF, the conveyors stop.
  • After the sensor X10, X12or X14 at the left of conveyor has detected a part, the corresponding conveyor is set ON and carries it to the tray at the right end.The conveyor stops 3seconds after a part has passed the sensor X11, X13 or X15at the right of conveyor.
  • Large, medium and small parts on the conveyor are sorted by the input of sensors Upper (X0), Middle(X1) and Lower (X2).

·       

Lift Control


    1)       When the sensor for Part on lift (X3) in the lift is turned ON, a part is carried to either of the following conveyors according to its size.

  • Large part: Upper conveyor
  • Medium part: Medium conveyor
  • Small part: Lower conveyor


     2)       Lift up command (Y2) and Lift down command(Y3) are controlled according to the lift position detected by the following sensors.

  • Upper: X6
  • Meddle: X5
  • Lower: X4


     3)       When a part is transferred from the lift to the conveyor, Lift rotation command (Y4) is set ON. 


     4)       After a part is transferred, the lift is to return to the initial position and stand by.


Ladder Program Description:

In this exercise, the size of parts carried on the conveyor is to be sorted using three sensors shown on the table.


Part size

Upper (X0)

Medium (X1)

Lower (X2)

Large

ON

ON

ON

Medium

OFF

ON

ON

Small

OFF

OFF

ON


The lift stop position is determined based on the input status of the position sensors X4to X6.

When distributing a small part, the lift does not move vertically. Only the rotation of the lift 
should be controlled in the initial position.


·         Turn ON [SW1] (X24) on the operation panel.

Result >>The conveyor moves to the right.


·         Press [PB1] (X20) on the operation panel.

Result >>A part is supplied from the hopper.


·         Operation of the lift

Result >>When a large or medium part is put on the lift, the lift moves up to the upper or middle conveyor and stops. When a small part is put on the lift, the lift remains in the initial position

·         Transfer of a part


Result >>After the lift rotates and a part is transferred to the conveyor, the conveyor moves to the right and the part is carried to the tray.

·         Return of the lift


Result >>The lift with no part returns to the initial position and stops there.

·         Repeated operation


When [PB1] (X20) is pressed, the operations starting from 2 are repeated.







http://news.chivindo.com/813/ladder-program-example-for-lifter-application.html

Comments

Popular posts from this blog

SketchUp Pro 2020 v20.1.235 Full Version

BAGAS31 – SketchUp Pro 2020 v20.1.235 Full Version  merupakan software yang dirancang untuk membantu sobat membuat dan mengedit model 3D. Dengan desain tampilan yang ‘clean’ dan simple, menjadikan software ini mudah untuk digunakan. Software ini hadir dengan editor bawaan yang memungkinkan sobat mendesain objek 3D dari awal, Layout designer untuk menggabungkan model 3D serta Style Builder untuk menyesuaikan model dengan gaya yang berbeda. Software ini juga memiliki fitur untuk mengimpor data dari format lain, seperti 3DS, DWG, KMZ, JPG, PNG, PSD, TIF, TGA dan sebagainya. Tanpa berpanjang lebar, silakan download  Sketch Up Pro  versi terbaru 2020 v20.1.235 Full Version   melalui link yang disediakan. SketchUp Pro 2020 v20.1.235 Full Version Screenshots : Download : SketchUp Pro 2020 v20.1.235 Installer | Size: 128 MB [ FileUp ] | [ up4ever ] JAMU SketchUp Pro 2020 v20.1.235 Full Version | Size: 14.5 MB [ FileUp ] | [ ...

Assembly ducting

Kode Konversi Digital

Angka dikodekan dalam bentuk lain, mewakili atau menggunakannya sesuai kebutuhan. Misalnya, Angka ‘Sembilan’ dikodekan dalam simbol Desimal (9)d, dalam Natural-Binary (1001)b. Komputer Digital berurusan bilangan biner. Metode mengkonversi kode dari satu format ke  format  lain  ➤ Biner ke BCD  (Binary Coded Decimal)  ➤ BCD ke Seven Segmen                       ➤  BCD ke Grey Code                              ➤  Grey Code ke BCD                              ➤ BCD ke  Excess-3                                ➤  Excess-3  ke BCD                ...

Skematik dan PCB Layout Rangkaian Adaptor (Power Supply) AC to DC output 5 Volt

Software Proteus 8 Professional merupakan salah satu software elektronik yang digunakan untuk membantu para designer dalam merancang dan mensimulasikan suatu rangkaian elektronik. Software ini memiliki dua fungsi sekaligus dalam satu paket, yaitu sebagai software untuk menggambar skematik dan digunakan sebagai merancang gambar Printed Circuit Board (PCB). Pada tulisan kali ini saya akan memberikan sedikit tutorial cara membuat rangkaian Adaptor (Power Supply) AC to DC untuk keluaran tegangan 5 volt. Aplikasi yang akan digunakan disini adalah Proteus 8 Profesional. Alasan saya menggunakan aplikasi ini karena inilah salah satu aplikasi paling popular digunakan para desainer. Selain itu aplikasi ini juga mudah didapat dan kompatibel dengan banyak platform. Sedangkan alasan saya mengangkat tema ini karena ini juga salah satu tugas mata kuliah saya di semester 4, yaitu mata kuliah Elektronika Dasar. Di mata kuliah ini banyak dijelaskan bagaimana membuat rangkaian elektronika dan praktik pem...

Studi Peralatan Pembangkit dan Penggerak Mula

Gangguan pada Pusat-pusat Listrik secara garis besar dapat dibagi atas 4 kelompok, yaitu : a. Gangguan pada sirkit listrik generator b. Gangguan pada mesin penggerak mula c. Gangguan pada instalasi yang berhubungan dengan lingkungan seperti instalasi air pendingin dan saluran air terbuka pada PLTA . d. Gangguan pada sirkit kontrol . Dalam instalasi yang dijaga oleh operator seperti Pusat Listrik dan Gardu Induk ada gangguan yang tidak atau belum dilihat oleh Relai , tapi dilihat oleh operator yang kemudian berinisiatif men-trip-kan atau membuka Pemutus Tenaga ( PMT )/ circuit breaker demi keselamatan instalasi , maka dalam hal ini operator bertindak sebagai relai. Gangguan pada Sirkit Listrik Generator yang menyebabkan tripnya PMT, pada umumnya disebabkan oleh : a. Gangguan diluar seksi generator tetapi PMT generator ikut trip sebagai akibat kurang selektifnya relai generator b. Ada gangguan dalam seksi generator yang disebabkan karena: " Kerusakan generator atau alat ...