Cable Commissioning: Post-Installation Testing Tips

Cable laying process

The main purpose of post installation cable testing is to check the cable and accessories for any defects that may have occurred during the installation process. Should a defect be found, the techniques of after installation testing help pinpoint the place of the fault and repair it.

The steps to be performed during post installation testing depend on the requirements to the newly installed cable or cable system; they may include the insulation and conductor resistance tests, sheath and conductor phase identification, cross bonding test, sequence impedance measurements, serving tests to check the quality of the outer sheath, sheath or screen resistance tests, and HV tests.

This post is going to discuss what needs to be taken care of in the process of a cable system commissioning process. While being quite obvious, these steps are often ignored to speed up the test procedures, but failure to follow them is likely to result in injuries to the personnel and significant time loss due to resulting cable system downtime in future.

Safety comes first

Danger! Electrical hazard
Since power cable testing carries electrical hazard, it is crucial to ensure the safety of the staff involved and to prevent unauthorized access to the testing site. The people present at in the testing area are to be limited to the testing personnel, who should have an appropriate line of communication. The testing site should be fenced off and warning signs should be put up.

In addition to safety reasons, it is important to stay clear of potential interruption as, for instance, the undesirable actions of observers might compromise the testing results and lengthen the time of testing.

Abide by the industry standards and regulations

Codes for cabling installation and testing have been written for a reason and are a good source of safe, reasonable and efficient practice during cable system commissioning.

Discipline and experience to achieve accurate results

Cables under test should be properly deegenergized, with earthing applied before and after testing cable ends should be insulated and the necessary precautions should be taken to avoid accidental contact. Care should be taken to remove the semiconducting material of the oversheath so as to prevent a flashover while testing the sheath.

No short cuts should be taken, with sufficient amount of time allocated to remove all the cross bondings in the link boxes.

Have the right cable testing equipment at hand

To avoid any interruptions and delays in the testing process, it is important to have on site testing systems for cable diagnosis and fault location matching the tested cable system specification. The testing equipment should be properly calibrated and used by experienced personnel.

Having found a fault, double check

In case a defect has been found, it is necessary to discharge the cable and check the integrity of all cable connections. Following this, the testing procedure is repeated, and if the defect is confirmed, a time domain reflectometer (TDR) can be used for prelocation in conjunction with a fault pinpointing system to locate the exact place of the defect.
Cable testing and commissioning

Discharge properly

The modern cable testing equipment is typically supplied with a discharge feature. However, a safe testing practice requires a manual discharge, so using a discharge rod at the end of the cable testing process should never be neglected.

Alexei Tiatiushkin
Marketing manager
KharkovEnergoPribor Ltd.
marketing@keppowertesting.uk
http://www.kep.ua


http://news.chivindo.com/367/cable-commissioning-post-installation-testing-tips.html

Comments

Popular posts from this blog

SketchUp Pro 2020 v20.1.235 Full Version

BAGAS31 – SketchUp Pro 2020 v20.1.235 Full Version  merupakan software yang dirancang untuk membantu sobat membuat dan mengedit model 3D. Dengan desain tampilan yang ‘clean’ dan simple, menjadikan software ini mudah untuk digunakan. Software ini hadir dengan editor bawaan yang memungkinkan sobat mendesain objek 3D dari awal, Layout designer untuk menggabungkan model 3D serta Style Builder untuk menyesuaikan model dengan gaya yang berbeda. Software ini juga memiliki fitur untuk mengimpor data dari format lain, seperti 3DS, DWG, KMZ, JPG, PNG, PSD, TIF, TGA dan sebagainya. Tanpa berpanjang lebar, silakan download  Sketch Up Pro  versi terbaru 2020 v20.1.235 Full Version   melalui link yang disediakan. SketchUp Pro 2020 v20.1.235 Full Version Screenshots : Download : SketchUp Pro 2020 v20.1.235 Installer | Size: 128 MB [ FileUp ] | [ up4ever ] JAMU SketchUp Pro 2020 v20.1.235 Full Version | Size: 14.5 MB [ FileUp ] | [ ...

Assembly ducting

Kode Konversi Digital

Angka dikodekan dalam bentuk lain, mewakili atau menggunakannya sesuai kebutuhan. Misalnya, Angka ‘Sembilan’ dikodekan dalam simbol Desimal (9)d, dalam Natural-Binary (1001)b. Komputer Digital berurusan bilangan biner. Metode mengkonversi kode dari satu format ke  format  lain  ➤ Biner ke BCD  (Binary Coded Decimal)  ➤ BCD ke Seven Segmen                       ➤  BCD ke Grey Code                              ➤  Grey Code ke BCD                              ➤ BCD ke  Excess-3                                ➤  Excess-3  ke BCD                ...

Skematik dan PCB Layout Rangkaian Adaptor (Power Supply) AC to DC output 5 Volt

Software Proteus 8 Professional merupakan salah satu software elektronik yang digunakan untuk membantu para designer dalam merancang dan mensimulasikan suatu rangkaian elektronik. Software ini memiliki dua fungsi sekaligus dalam satu paket, yaitu sebagai software untuk menggambar skematik dan digunakan sebagai merancang gambar Printed Circuit Board (PCB). Pada tulisan kali ini saya akan memberikan sedikit tutorial cara membuat rangkaian Adaptor (Power Supply) AC to DC untuk keluaran tegangan 5 volt. Aplikasi yang akan digunakan disini adalah Proteus 8 Profesional. Alasan saya menggunakan aplikasi ini karena inilah salah satu aplikasi paling popular digunakan para desainer. Selain itu aplikasi ini juga mudah didapat dan kompatibel dengan banyak platform. Sedangkan alasan saya mengangkat tema ini karena ini juga salah satu tugas mata kuliah saya di semester 4, yaitu mata kuliah Elektronika Dasar. Di mata kuliah ini banyak dijelaskan bagaimana membuat rangkaian elektronika dan praktik pem...

Studi Peralatan Pembangkit dan Penggerak Mula

Gangguan pada Pusat-pusat Listrik secara garis besar dapat dibagi atas 4 kelompok, yaitu : a. Gangguan pada sirkit listrik generator b. Gangguan pada mesin penggerak mula c. Gangguan pada instalasi yang berhubungan dengan lingkungan seperti instalasi air pendingin dan saluran air terbuka pada PLTA . d. Gangguan pada sirkit kontrol . Dalam instalasi yang dijaga oleh operator seperti Pusat Listrik dan Gardu Induk ada gangguan yang tidak atau belum dilihat oleh Relai , tapi dilihat oleh operator yang kemudian berinisiatif men-trip-kan atau membuka Pemutus Tenaga ( PMT )/ circuit breaker demi keselamatan instalasi , maka dalam hal ini operator bertindak sebagai relai. Gangguan pada Sirkit Listrik Generator yang menyebabkan tripnya PMT, pada umumnya disebabkan oleh : a. Gangguan diluar seksi generator tetapi PMT generator ikut trip sebagai akibat kurang selektifnya relai generator b. Ada gangguan dalam seksi generator yang disebabkan karena: " Kerusakan generator atau alat ...