The testhead is that portion of the tester that supports the PIN, ASRU and Controller cards.   The testhead is divided into two BANKS and each BANK is divided into two MODULES, see figure 2 below.  Bank 1 contains modules 0 and 1, bank 2 contains modules 2 and 3.  The test fixtures are placed on the banks of the tester and locked down for board testing.  The testhead cards interface to the test fixture through the spring loaded pogo pin “nails” at the top edge on each of these card types.

4.4       Support Bay

The support bay is a stand-alone cabinet that houses the power supplies for the Unit Under Test.  This bay also houses the test station power distribution unit and test station controller on earlier models.

4.5       Emergency Shutdown Switch

The emergency shutdown switch is the large red button located at the lower left corner on the front of the testhead.  It turns off all AC power to the testhead, and is equivalent to turning off the main circuit breaker on the rear of the support bay.  Press the emergency shutdown switch if you ever need to power down the testhead and its associated equipment in an emergency situation.

           CAUTION:     DO NOT use the emergency shutdown switch as a substitute for
correct power-down procedures; i.e., executing the “testhead
power off” command.

Frequent use of the emergency shutdown switch can cause premature failure of the main circuit breaker on the rear of the support bay.

To restore power after pressing the emergency shutdown switch, turn on the main circuit breaker on the rear of the support bay.

4.6        Guided Probe

A convenient holder for the guided probe is provided at the upper corner on the front of the testhead.  When not using the guided probe, store it in its holder.


5.0        POWERING UP THE TESTER

5.1       Locate the tester circuit breakers, they are on the rear panel of the power distribution unit,
in the enclosure mounted to the right hand side of the testhead or in the support bay.  Place the circuit breakers in the “on” position.

5.2        Ensure that the test station controller (Signal Processor Unit, SPU), located in the
enclosure mounted on the left hand side of the testhead or in the support bay, is turned on.

Caution:  On systems with separate SPU and disk drive units, turn on the power to the disk drive and peripheral devices prior to powering up the SPU.  Be sure to allow time for the disk drives to spin up to speed before applying power to the SPU.

5.3        Ensure that the test station monitor and strip printer are both turned on.


5.2        Ensure that the UUT power supplies located in the support bay are turned on.

Comments

Popular posts from this blog

SketchUp Pro 2020 v20.1.235 Full Version

BAGAS31 – SketchUp Pro 2020 v20.1.235 Full Version  merupakan software yang dirancang untuk membantu sobat membuat dan mengedit model 3D. Dengan desain tampilan yang ‘clean’ dan simple, menjadikan software ini mudah untuk digunakan. Software ini hadir dengan editor bawaan yang memungkinkan sobat mendesain objek 3D dari awal, Layout designer untuk menggabungkan model 3D serta Style Builder untuk menyesuaikan model dengan gaya yang berbeda. Software ini juga memiliki fitur untuk mengimpor data dari format lain, seperti 3DS, DWG, KMZ, JPG, PNG, PSD, TIF, TGA dan sebagainya. Tanpa berpanjang lebar, silakan download  Sketch Up Pro  versi terbaru 2020 v20.1.235 Full Version   melalui link yang disediakan. SketchUp Pro 2020 v20.1.235 Full Version Screenshots : Download : SketchUp Pro 2020 v20.1.235 Installer | Size: 128 MB [ FileUp ] | [ up4ever ] JAMU SketchUp Pro 2020 v20.1.235 Full Version | Size: 14.5 MB [ FileUp ] | [ up4ever ] Password: www.bagas31.info |

Ringkasan Sirkuit Operational Amplifier

Penguat Operasional yang khas. Rangkaian Penguat Operasional Non-Ideal memiliki Impedansi Masukan yang terbatas, Impedansi Output Non-Nol, dan Gain yang terbatas.  Jenis Penguat Diferensial.   Penguat Diferensial    ➤ Penguat Diferensial Sepenuhnya (Mirip op-amp, tetapi dengan dua output)  ➤ Penguat Instrumentasi (Dibangun dari tiga op-amp)  ➤ Penguat Isolasi (Mirip penguat instrumentasi, tetapi dengan toleransi ke tegangan mode-umum yang akan menghancurkan op-amp biasa)  ➤ Penguat Umpan Balik Negatif (Dibangun dari satu atau lebih op-amp dan jaringan umpan balik resistif). Penguat Operasional dioptimalkan penggunaan dengan umpan balik Negatif, Ketika umpan balik Positif diperlukan, komparator biasanya lebih tepat.   Operational Amplifier     ➽  Inverter  Op-Amp     ➽  Non-Inverting  Op-Amp     ➽  Voltage Follower   ➽  Op-Amp  Inverter    ➽    Diffrential Amplifier   ➽    Summing   Op-Amp     ➽    Subtractor   Op-Amp   ➽    Op-Amp  Differentiator   ➽    Op-Amp  Integrator   ➽    Op-Am

Ferite Core Transformer

What are Ferrite Core Transformers? The transformer made out of ferrite core is called ferrite core transformer . The ferrite core transformer is used for higher frequency applications.The power transformer is made out of CRGO steel core which operate at 50 or 60 Hz frequency. The transformer operating at higher frequency is designed with a ferrite core. The composition of ferrite core in transformer is iron oxides,combined with nickle, zinc and manganese compounds. These compounds have low coercivity  and also called soft ferrites.   Advantage of use of  Ferrite Core ? A major advantage to a ferrite core is its high electrical resistance to high current. The high resistance to eddy current lead lower eddy current losses over many frequencies.  Ferrites have an advantage over other types of magnetic materials due to their high electrical resistivity and low eddy current losses over a wide frequency range. These characteristics, along with high permeability, make ferrite ideal for use i

Memahami Pull dan Push System dalam Industri Manufacture

Pull, Push   dalam kamus bahasa berarti tarik, dorong. Jika membicarakan Lean Manufacturing dan Just In Time (JIT) , rasanya dua kata ini sangat erat kaitannya. Dibanding Push System , Pull System yang lebih menjadi pusat perhatian dalam implementasi JIT . Pull merupakan proses operasi mulai dari tahap pembelian hingga delivery customer yang hingga saat ini dianggap modern dan bisa mengikuti arah pasar. Sedangkan istilah yang satunya, yaitu Push system , merepresentasikan  sebuah system operasi tradisional dan konservative, identik dengan aktivitas yang tidak memiliki nilai tambah atau istilahnya " waste ". Untuk menghindari stock out , manajemen menentukan tingkat volume pembelian material dan l evel of inventory , tidak berpedoman pada turunnya Purchase order (PO) customer. Sebagai acuan yaitu forecasting atau peramalan tingkat penjualan. Dalam manufacturing, Pull System kurang lebih memiliki arti sebagai berikut : a) Venkatesh (1996) menyatakan pada sistem  push, sebuah

Autodesk SketchBook Pro 2021 Full Version

BAGAS31 – Sesuai dengan namanya, Autodesk SketchBook Pro 2021 Full Version ini merupakan software digital sketching atau drawing terbaik yang bisa kamu gunakan. Pada versi terbaru kali ini, ada beberapa penambahan fitur yang sangat efektif. Dengan fitur baru tersebut, diharapkan mampu meningkatkan proses sketching maupun drawing kamu. Autodesk SketchBook sendiri sudah bisa kamu dapatkan secara gratis melalui website resminya. Namun untuk kamu yang mau download versi Autodesk Sketchbook Pro, maka bisa langsung download melalui link yang sudah saya sediakan di bawah ini. Download Autodesk SketchBook Pro 2021 Full Version Screenshot: System Requirements: Windows 10 2.5 – 2.9 GHz of Intel or AMD CPU 4 GB of Memory 256 MB Graphics card with OpenGL 2.0 support We recommend that you use a pressure-sensitive tablet and pen for basic features Download: Autodesk SketchBook Pro 2021 Full Version [ FileUp ][ Uptobox ][ UsersDrive ] Jamu Only [ FileUp ][ Uptob