Skip to main content

POWERING DOWN THE TESTER

9.0       POWERING DOWN THE TESTER

            Note:   The test system must always be shut down in a controlled
manner or data may be lost.

9.1              In order to properly power down the tester first all running processes must be halted and the disk drives must be unmounted. This process requires system root user privilege and must be performed by the test engineering department or its authorized representative.

9.2       Exit from all running BT-BASIC windows.              At the HP VUE graphical interface, click the mouse on the terminal icon on the Workspace Manager bar displayed at the bottom of the screen.

9.3        This will open an hpterm window on the screen.  If not currently logged into the system
as user root, type the following at the command line $ prompt:  $ SU -root  and press
the “ENTER” key on the keyboard.

9.4        Enter the correct password when queried by the system.

9.5        Type shutdown –h 1 at the command line # prompt and press the “ENTER” key on
the keyboard.  The system will broadcast a message to all logged in users informing them that the system will be shut down in 1 minute.

9.6        When the shutdown procedure has completed the following message will appear on the
tester display:             
                                    System has halted
                                    OK to turn off power or reset system

9.7        It is now okay to power off the tester.  Caution must be exercised if the tester hardware

configuration consists of  separate hard disk units and signal processor unit.  In this case power off the Signal Processing Unit (SPU) first.  Then power down the disk drives and other peripheral devices afterwards.

Comments

Popular posts from this blog

SketchUp Pro 2020 v20.1.235 Full Version

BAGAS31 – SketchUp Pro 2020 v20.1.235 Full Version  merupakan software yang dirancang untuk membantu sobat membuat dan mengedit model 3D. Dengan desain tampilan yang ‘clean’ dan simple, menjadikan software ini mudah untuk digunakan. Software ini hadir dengan editor bawaan yang memungkinkan sobat mendesain objek 3D dari awal, Layout designer untuk menggabungkan model 3D serta Style Builder untuk menyesuaikan model dengan gaya yang berbeda. Software ini juga memiliki fitur untuk mengimpor data dari format lain, seperti 3DS, DWG, KMZ, JPG, PNG, PSD, TIF, TGA dan sebagainya. Tanpa berpanjang lebar, silakan download  Sketch Up Pro  versi terbaru 2020 v20.1.235 Full Version   melalui link yang disediakan. SketchUp Pro 2020 v20.1.235 Full Version Screenshots : Download : SketchUp Pro 2020 v20.1.235 Installer | Size: 128 MB [ FileUp ] | [ up4ever ] JAMU SketchUp Pro 2020 v20.1.235 Full Version | Size: 14.5 MB [ FileUp ] | [ ...

Assembly ducting

Kode Konversi Digital

Angka dikodekan dalam bentuk lain, mewakili atau menggunakannya sesuai kebutuhan. Misalnya, Angka ‘Sembilan’ dikodekan dalam simbol Desimal (9)d, dalam Natural-Binary (1001)b. Komputer Digital berurusan bilangan biner. Metode mengkonversi kode dari satu format ke  format  lain  ➤ Biner ke BCD  (Binary Coded Decimal)  ➤ BCD ke Seven Segmen                       ➤  BCD ke Grey Code                              ➤  Grey Code ke BCD                              ➤ BCD ke  Excess-3                                ➤  Excess-3  ke BCD                ...

Skematik dan PCB Layout Rangkaian Adaptor (Power Supply) AC to DC output 5 Volt

Software Proteus 8 Professional merupakan salah satu software elektronik yang digunakan untuk membantu para designer dalam merancang dan mensimulasikan suatu rangkaian elektronik. Software ini memiliki dua fungsi sekaligus dalam satu paket, yaitu sebagai software untuk menggambar skematik dan digunakan sebagai merancang gambar Printed Circuit Board (PCB). Pada tulisan kali ini saya akan memberikan sedikit tutorial cara membuat rangkaian Adaptor (Power Supply) AC to DC untuk keluaran tegangan 5 volt. Aplikasi yang akan digunakan disini adalah Proteus 8 Profesional. Alasan saya menggunakan aplikasi ini karena inilah salah satu aplikasi paling popular digunakan para desainer. Selain itu aplikasi ini juga mudah didapat dan kompatibel dengan banyak platform. Sedangkan alasan saya mengangkat tema ini karena ini juga salah satu tugas mata kuliah saya di semester 4, yaitu mata kuliah Elektronika Dasar. Di mata kuliah ini banyak dijelaskan bagaimana membuat rangkaian elektronika dan praktik pem...

Studi Peralatan Pembangkit dan Penggerak Mula

Gangguan pada Pusat-pusat Listrik secara garis besar dapat dibagi atas 4 kelompok, yaitu : a. Gangguan pada sirkit listrik generator b. Gangguan pada mesin penggerak mula c. Gangguan pada instalasi yang berhubungan dengan lingkungan seperti instalasi air pendingin dan saluran air terbuka pada PLTA . d. Gangguan pada sirkit kontrol . Dalam instalasi yang dijaga oleh operator seperti Pusat Listrik dan Gardu Induk ada gangguan yang tidak atau belum dilihat oleh Relai , tapi dilihat oleh operator yang kemudian berinisiatif men-trip-kan atau membuka Pemutus Tenaga ( PMT )/ circuit breaker demi keselamatan instalasi , maka dalam hal ini operator bertindak sebagai relai. Gangguan pada Sirkit Listrik Generator yang menyebabkan tripnya PMT, pada umumnya disebabkan oleh : a. Gangguan diluar seksi generator tetapi PMT generator ikut trip sebagai akibat kurang selektifnya relai generator b. Ada gangguan dalam seksi generator yang disebabkan karena: " Kerusakan generator atau alat ...